Caterpillar 6D16 Engine Flywheel Assembly Removal Guide
This instruction show you guide on how to flywheel assembly for Caterpillar 6D16 engine
Procedures:
Flywheel assembly
[Removal] CAT ET Adapter 3
To remove the flywheel assembly 4, screw the mounting bolts 2 into the removal holes A.
[Installation]
• The bolts 2 can be used only three times. Before refitting the bolts,make a punch mark on the head of each one to indicate times of reuse.
CAUTION
If any bolt already has three punch marks, it must not be reused any more; replace it with a new one.Caterpillar ET Diagnostic Software 2022a
• Tighten the bolts 2 to their specified torque, then tighten them further in accordance with the following procedure:
• Turn the holder B of the Socket Wrench counter-clockwise to tension the built-in spring.
C: Socket
D: Rod
E: Rod (extension)
• Set the Socket Wrench such that the built-in spring forces the rod E against the Magnetic Base.
• On the holder B, select the inscribed line F that is easiest to see.
• Using the selected line as a reference, turn the socket 150° clockwise. (One gradation on the scale G represents 5°.)Caterpillar factory pass calculator
CAUTION
Since the bolts 2 utilize the plastic region tightening method,they must not be tightened further after this procedure.
Comments
Post a Comment